This is an example of a HTML caption with a link.

CMMI Vs. ITIL

CMMI Vs. ITIL

CMMI and ITIL are two distinctly different maturity models. The fundamental difference between CMMI vs ITIL is that while CMMI focuses on software process maturity, ITIL is broader in scope and focus on all areas of infrastructure, including software and hardware.

Origins

Carnegie Mellon University (CMU)’s Software Engineering Institute developed the first Capability Maturity Model (CMM) in 1990, and followed it up with the Capability Maturity Model Integration (CMMI) that integrated multiple CMMs.

The United Kingdom’s Office of Government Commerce (OGC) developed the IT Infrastructure Library (ITIL) in 1986 to provide guidance for service management. These set of guidelines has since then emerged as the international de facto standard framework of best practices for IT service management and infrastructure. ITIL originated as a collection of books, each covering a specific practice within the IT service management.
READ MORE

CMMI - Development

Maturity Levels: CMMI for Development
There are five maturity levels. However, maturity level ratings are awarded for levels 2 through 5. The process areas below and their maturity levels are listed for the CMMI for Development model:

Maturity Level 2 - Managed
✔ CM - Configuration Management
✔ MA - Measurement and Analysis
✔ PMC - Project Monitoring and Control
✔ PP - Project Planning
✔ PPQA - Process and Product Quality Assurance
✔ REQM - Requirements Management
✔ SAM - Supplier Agreement Management

Maturity Level 3 - Defined
✔ DAR - Decision Analysis and Resolution
✔ IPM - Integrated Project Management
✔ OPD - Organizational Process Definition
✔ OPF - Organizational Process Focus
✔ OT - Organizational Training
✔ PI - Product Integration
✔ RD - Requirements Development
✔ RSKM - Risk Management
✔ TS - Technical Solution
✔ VAL - Validation
✔ VER - Verification

Maturity Level 4 - Quantitatively Managed
✔ OPP - Organizational Process Performance
✔ QPM - Quantitative Project Management

Maturity Level 5 - Optimizing
✔ CAR - Causal Analysis and Resolution
✔ OPM - Organizational Performance Management
READ MORE